SCI

Riding the Wind and Waves, Moving Forward Courageously – CNNC Bulk Orders Delivered on Time

SCICOOLING and CNNC successful delivery of environmental test equipment for bulk orders

“On the vast sea, fierce winds gather dark clouds. Between the clouds and the sea, the petrel soars proudly like black lightning. ”

———— Gorky’s sea swallow story, it celebrates the spirit of facing danger with a smile, a spirit SCICOOLING admires: good times often make people content with the present, and adversity makes heroes.

On July 12, CNNC’s bulk orders shipped on time and headed to the customer’s site

SCICOOLING low temperature test equipment being prepared and delivered for CNNC bulk order
SCICOOLING completed the production, inspection, and delivery preparation of nine low temperature test units for CNNC.

As a qualified supplier to CNNC Group, SCICOOLING is fully committed to living up to its trust. Nine ultra-low temperature devices were delivered on schedule. Behind the on-time delivery of orders is SCICOOLING’s struggle against difficulties and adversity, embodying the SCICOOLING spirit. Amid the severe international pandemic situation and overall economic downturn, and in June there was a wave of COVID-19 resurgence in Beijing, affecting everything from component procurement to logistics shipments to varying degrees. However, the SCICOOLING team works together sincerely, united, and sets out toward one goal—”on-time delivery.”

SCICOOLING environmental test equipment loaded on truck for transportation to customer site
SCICOOLING equipment was securely loaded and transported to the customer site for delivery.

Carrying trucks embodying SCICOOLING’s passion and sincerity, it arrives on time at the customer’s site, ultimately completing its brief journey and fulfilling its mission. This is just a small glimpse of SCICOOLING’s journey forward.

Half of 2020 has passed; this is an unusual year, a year full of adversity. In these turbulent years, SCICOOLING has never stopped moving forward, striving to ensure quality and complete orders on time.

2020/3/10     Delivered 4 dual-axis rotary temperature test chambers

2020/5/18     Delivered 7 general-purpose temperature test chambers

2020/5/25     A total of 9 pieces of equipment—including general-purpose rapid thermo-varying temperature test chambers, electronic moisture-proof chambers, blast drying ovens, and high-temperature test chambers—were delivered

2020/5/28     Four custom refrigeration units were delivered

2020/6/02     A total of six pieces of equipment—1000L rapid temperature change temperature test chamber, high and low temperature and humidity test chamber, and dual-axis rotary table temperature control boxes—were delivered

2020/6/04     Five multi-channel temperature monitoring mobile platforms were delivered

2020/7/02     Three non-standard temperature test chambers were delivered

2020/7/07     Three customized high and low temperature environmental chambers were delivered

2020/7/12      A total of 9 pieces of equipment—-80°C small cryogenic units, -100°C mini cryogenic units, and integrated ultra-low temperature cold traps—have been delivered

…………

SCICOOLING -80°C and -100°C ultra low temperature equipment prepared for delivery
SCICOOLING successfully completed the delivery of -80°C and -100°C ultra low temperature equipment.

“The sea swallow calls and flies, like black lightning, arrows piercing through the clouds, its wings splashing up waves.”

Riding the wind and waves, forging ahead bravely, 2020 continues, and SCICOOLING is still forging ahead!

Related Resources & Next Step

Suggested internal links: Industries > Nuclear Industry Solutions  |  Contact > Submit a Project Request

  Need to evaluate a test profile or configure a chamber? Explore the relevant SCICOOLING solution and submit your project requirements.  

Leave a Reply

Your email address will not be published. Required fields are marked *

ENGINEERING CONSULTATION

Turn your requirement into a buildable chamber specification.

Share the essentials. Our application engineers will help define a practical, reliable system.

Application and standards reviewPractical chamber configurationInitial response within 1 business day
SCI INSTRUMENTS CO.LTD
info@scicoolings.com
PROJECT ENQUIRY

Request Engineering Consultation

Tell us the essentials. Our application engineers will help complete the specification.