SCI

Ultra-Low-Temperature Equipment

CTR Deep-Cryogenic Chamber

Advanced refrigeration: single-compressor system capable of reaching -170°C.
High performance: meets or exceeds applicable Chinese national standards and test procedures.

Send Enquiry

Primary Applications

Ultra-low-temperature storage
Extreme-temperature shock
Ultra-low-temperature screening
Ultra-low-temperature separation and extraction
Partial replacement for small liquid-nitrogen systems

Product Features

Advanced refrigeration: single-compressor system capable of reaching -170°C.
High performance: meets or exceeds applicable Chinese national standards and test procedures.
Compact and quiet: small footprint, easy mobility and low-noise operation.
Simple operation: clear, user-friendly HMI.
Multiple protections: comprehensive protection for specimens and equipment.
Multiple interfaces: various data interfaces and development resources for system integration.

Applicable Standards

GB/T 20154-2006 — Low-temperature storage cabinets
GB/T 10589-2008 — Technical requirements for low-temperature test chambers
GB/T 2423.1-2008 — Environmental testing for electric and electronic products, Part 2: Test methods, Test A: Cold
GJB 150.4A-2009 — Laboratory environmental test methods for military equipment, Part 4: Low-temperature test

Main Technical Specifications
Model CTR-CT8002-01F/W CTR-CT10002-01F/W CTR-CT12002-01F/W CTR-CT17002-01F/W
Minimum Temperature -80 -100 -120 -170
Nominal Volume L Approx. 25
Workspace Dimensions D×H(mm) Φ280×420
Exterior Dimensions W×H×D(mm) 700×970×1200 850×970×1400
Temperature Range -80~+80 -100~+80 -120~+80 -170~+80
Pull-Down Time h +25°C to -80°C: ≤4 h +25°C to -100°C: ≤4 h +25°C to -120°C: ≤5 h +25°C to -170°C: ≤8 h
Temperature Fluctuation ≤±0.5°C (precision-control mode); ≤±2.0°C (energy-saving mode)
Operating Noise dB(A) 52~62 52~65 52~65 52~70
Installed Power kW 3.2 4.5 6 6.5
Equipment Weight kg 230 260 275 320
Power Supply 380 V ±10% AC, 50 Hz, 3L + N + PE; dedicated supply with separate circuit breaker and reliable grounding
Configuration — Controller 7-inch high-brightness Chinese-language touchscreen with imported programmable controller
Configuration — Defrost Control Manual / automatic defrost; defrost cycle completed within 30 min
Configuration — Communication Interfaces Reserved DCS interface for remote status signals such as Refrigeration / Stop, Defrost and Fault; reserved RS485 interface with communication protocol
ENGINEERING CONSULTATION

Turn your requirement into a buildable chamber specification.

Share the essentials. Our application engineers will help define a practical, reliable system.

Application and standards reviewPractical chamber configurationInitial response within 1 business day
SCI INSTRUMENTS CO.LTD
info@scicoolings.com
PROJECT ENQUIRY

Request Engineering Consultation

Tell us the essentials. Our application engineers will help complete the specification.